Contact

Post:Aeronautical Information Management
General Civil Aviation Authority
P.O. Box 666
Abu Dhabi
United Arab Emirates
Tel:+971 2 599 6895
Fax:+971 2 599 6889
AFS:OMAEYOYX
Email:aim@szc.gcaa.ae
URL:www.gcaa.gov.ae

AIP Supplement - United Arab Emirates

General Civil Aviation Authority

AIP SUP

48/2025

Effective from 16 OCT 2025

UFN

Published on 16 OCT 2025

OMFJ - FUJAIRAH / INTERNATIONAL – AERODROME WORK IN PROGRESS

INTRODUCTION

This Supplement replaces AIP Supplement 31/2025.

DESCRIPTION

The purpose of this AIP Supplement is to inform operators of various closures and changes at OMFJ - FUJAIRAH / INTERNATIONAL airport.

The withdrawn RWY 11/29 is being maintained in the AIP for future re-use after comprehensive maintenance.

1. Runway 11/29 unavailability

1.1 RWY 11/29 and associated radio navigation and landing aids are not available.
1.2 All SID RWY 11/29 not available. Refer AIP OMFJ AD 2.22 and charts OMFJ-AD 2-41, OMFJ-AD 2-43.
1.3 All STAR RWY 29 not available. Refer AIP OMFJ AD 2.22 and chart OMFJ-AD 2-44.
1.4 IAP RWY 29 not available. Refer AIP OMFJ AD 2.22 and charts OMFJ-AD 2-65, OMFJ-AD 2-66, OMFJ-AD 2-67, OMFJ-AD 2-68, OMFJ-AD 2-70 and OMFJ-AD 2-71.

2. Temporary Taxiway (PARALLEL TAXIWAY)

2.1 Temporary taxiway (PARALLEL TAXIWAY) is established using part of the withdrawn RWY 11/29.

3. Taxiway restrictions

3.1 TWY F is restricted to towing only between PARALLEL TAXIWAY and Maintenance Apron.

4. Aerodrome work in progress

4.1 Details of different phases of construction works are indicated below with the aerodrome layout during the OMFJ - FUJAIRAH / INTERNATIONAL airport expansion project to be referred to in conjunction with OMFJ AD-2-21.
4.2 Establishment of taxiways after completion of each Phase will be advised by NOTAM.
4.2.1 PHASE I is complete.
4.2.2 PHASE II - TWY J is under construction and will have the following characteristics:
4.2.3 PHASE III - TWY K is under construction and will have the following characteristics:
4.2.4 PHASE IV - TWY F1, TWY F2, and TWY U are closed.
Aerodrome WIP Phases
PDF